Wells on Aruba

  web overview     

Challenges in work

With an initial depth of 50 m, reverse (air) circulation drilling and record size PVC casings O.D. 500 mm, the works were a real challenge to execute within time, budget and specification demands. Urgency for completion of the wells was high, as WEB needed the additional capacity to feed the Reversed Osmosis plant. Very fine project with extreme demands with equipment Nordmeyer DSB 1/3.5 drill rig. Compliments for the crew.

wells overzicht

Exploratory drillings with Massenza MI-2

  coring web     

Record size straight flush PVC casings

  casing 500 OD     

Installation of casings

  WEB BEN     

Installation of casings

  casing placement     

Pump test

  test pump     

Pump test

  drawdown test     

Hole opener

  WEB holeopener